{"id":5475,"date":"2026-10-02T16:07:08","date_gmt":"2026-10-02T14:07:08","guid":{"rendered":"https:\/\/inside.eiffageconstructionbelux.be\/projecten\/college-saint-pierre-a-jette-sint-pieterscollege-te-jette\/"},"modified":"2026-10-27T08:08:43","modified_gmt":"2026-10-27T07:08:43","slug":"college-saint-pierre-a-jette-sint-pieterscollege-te-jette","status":"publish","type":"project","link":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/inside-41\/projecten\/college-saint-pierre-a-jette-sint-pieterscollege-te-jette\/","title":{"rendered":"Coll\u00e8ge Saint-Pierre \u00e0 Jette"},"content":{"rendered":"<p>Le projet se compose de trois parties : le b\u00e2timent \u00e0 front de rue, les b\u00e2timents existants situ\u00e9s \u00e0 l&rsquo;arri\u00e8re, et, entre les deux, le nouveau b\u00e2timent qui accueille la cr\u00e8che.<\/p>\n<p>Le b\u00e2timent c\u00f4t\u00e9 rue a \u00e9t\u00e9 partiellement d\u00e9moli ; seul le rez-de-chauss\u00e9e a \u00e9t\u00e9 conserv\u00e9.<\/p>\n<p>Les 1er, 2e et 3e \u00e9tages ont \u00e9t\u00e9 enti\u00e8rement reconstruits. Au 1er \u00e9tage, une salle de sport a \u00e9t\u00e9 r\u00e9alis\u00e9e, au 2e \u00e9tage, une cour de r\u00e9cr\u00e9ation ext\u00e9rieure a \u00e9t\u00e9 am\u00e9nag\u00e9e, et au 3e \u00e9tage, une serre de 8 m\u00e8tres sur 10 a \u00e9t\u00e9 install\u00e9e, pouvant servir d&rsquo;espace polyvalent ou de salle de classe.<\/p>\n<p>De nouvelles menuiseries ext\u00e9rieures ont \u00e9t\u00e9 pos\u00e9es, et les fa\u00e7ades ont \u00e9t\u00e9 isol\u00e9es puis parachev\u00e9es d&rsquo;un enduit de type cr\u00e9pi. Au sein du b\u00e2timent, le chauffage, la ventilation et l&rsquo;installation \u00e9lectrique ont \u00e9t\u00e9 enti\u00e8rement remis \u00e0 neuf conform\u00e9ment aux normes les plus r\u00e9centes. Un ascenseur a \u00e9galement \u00e9t\u00e9 install\u00e9.<\/p>\n<p>Dans le b\u00e2timent arri\u00e8re, un local \u00e0 v\u00e9los a \u00e9t\u00e9 am\u00e9nag\u00e9 et des sanitaires suppl\u00e9mentaires ont \u00e9t\u00e9 int\u00e9gr\u00e9s dans plusieurs classes de maternelle. Le syst\u00e8me de d\u00e9tection incendie existant, tr\u00e8s limit\u00e9, a \u00e9t\u00e9 enti\u00e8rement renouvel\u00e9. Dans la zone situ\u00e9e entre ces deux \u00e9difices, un nouveau b\u00e2timent semi-enterr\u00e9 a \u00e9t\u00e9 r\u00e9alis\u00e9, con\u00e7u enti\u00e8rement en b\u00e9ton \u00e9tanche. Une cour de r\u00e9cr\u00e9ation \u00e0 ciel ouvert a \u00e9t\u00e9 am\u00e9nag\u00e9e sur la toiture de ce nouveau volume. L&rsquo;int\u00e9rieur a fait l&rsquo;objet d&rsquo;un am\u00e9nagement complet, dot\u00e9 de l&rsquo;ensemble des techniques requises.<\/p>\n<p>Les espaces ext\u00e9rieurs ont fait l\u2019objet d\u2019une requalification compl\u00e8te. Entre autres interventions, deux ascenseurs d\u00e9di\u00e9s aux personnes \u00e0 mobilit\u00e9 r\u00e9duite (PMR) ont \u00e9t\u00e9 install\u00e9s.<\/p>\n<p>Les toitures plates ont quant \u00e0 elles \u00e9t\u00e9 v\u00e9g\u00e9talis\u00e9es.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le projet se compose de trois parties : le b\u00e2timent \u00e0 front de rue, les b\u00e2timents existants situ\u00e9s \u00e0 l&rsquo;arri\u00e8re, et, entre les deux, le nouveau b\u00e2timent qui accueille la cr\u00e8che. Le b\u00e2timent c\u00f4t\u00e9 rue a \u00e9t\u00e9 partiellement d\u00e9moli ; seul le rez-de-chauss\u00e9e a \u00e9t\u00e9 conserv\u00e9. Les 1er, 2e et 3e \u00e9tages ont \u00e9t\u00e9 enti\u00e8rement [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5474,"menu_order":60,"template":"","edition":[251],"project_category":[64],"project_branch":[222],"project_region":[48],"class_list":["post-5475","project","type-project","status-publish","has-post-thumbnail","hentry","edition-inside-41","project_category-livres","project_branch-pit-eiffage","project_region-bruxelles"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":4,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5475\/revisions"}],"predecessor-version":[{"id":5971,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5475\/revisions\/5971"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media\/5474"}],"wp:attachment":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media?parent=5475"}],"wp:term":[{"taxonomy":"edition","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/edition?post=5475"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_category?post=5475"},{"taxonomy":"project_branch","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_branch?post=5475"},{"taxonomy":"project_region","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_region?post=5475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}