{"id":5122,"date":"2026-10-02T14:56:07","date_gmt":"2026-10-02T12:56:07","guid":{"rendered":"https:\/\/inside.eiffageconstructionbelux.be\/projecten\/pose-de-la-premiere-pierre-du-nouveau-campus-de-la-haute-ecole-leonard-de-vinci-2\/"},"modified":"2026-10-23T14:18:05","modified_gmt":"2026-10-23T12:18:05","slug":"pose-de-la-premiere-pierre-du-nouveau-campus-de-la-haute-ecole-leonard-de-vinci-2","status":"publish","type":"project","link":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/inside-41\/projecten\/pose-de-la-premiere-pierre-du-nouveau-campus-de-la-haute-ecole-leonard-de-vinci-2\/","title":{"rendered":"Pose de la premi\u00e8re pierre du nouveau campus de la Haute \u00c9cole L\u00e9onard de Vinci"},"content":{"rendered":"<p><strong>Pose de la premi\u00e8re pierre du nouveau campus de la Haute \u00c9cole L\u00e9onard de Vinci \u00e0 Woluwe-Saint-Lambert <\/strong><\/p>\n<p>Le mercredi 20 mai, nous nous sommes r\u00e9unis \u00e0 Woluwe-Saint-Lambert pour la pose de la premi\u00e8re pierre du nouveau campus de la Haute \u00c9cole L\u00e9onard de Vinci.<\/p>\n<p>L&rsquo;\u00e9v\u00e9nement a d\u00e9but\u00e9 par une introduction de Julien Nicaise \/ Julien Federinov (directeur-pr\u00e9sident) et de Didier Lambert (pr\u00e9sident du conseil d&rsquo;administration), suivie d&rsquo;une pr\u00e9sentation d\u00e9taill\u00e9e du projet par, entre autres, le groupement de ma\u00eetrise d&rsquo;oeuvre Dietmar Feichtinger Architectes \u2013 Low Architecten \u2013 Sweco. La premi\u00e8re pierre a ensuite \u00e9t\u00e9 officiellement pos\u00e9e, marquant le coup d&rsquo;envoi symbolique et festif de la construction.<\/p>\n<p>Le nouveau campus accueillera trois secteurs d&rsquo;enseignement :<\/p>\n<ul>\n<li>Sant\u00e9<\/li>\n<li>Sciences Humaines &amp; Sociales<\/li>\n<li>Sciences &amp; Technologies<\/li>\n<\/ul>\n<p>Le b\u00e2timent comptera cinq niveaux, dont deux en sous-sol abritant des auditoires. Un atrium central reliera le foyer, l&rsquo;auditorium et la biblioth\u00e8que gr\u00e2ce \u00e0 de larges escaliers et des terrasses. \u00c0 l&rsquo;int\u00e9rieur prendront place des espaces d&rsquo;apprentissage ouverts et des salles de cours. En toiture, des toits v\u00e9g\u00e9talis\u00e9s accueilleront un potager collectif.<\/p>\n<p>Un remarquable projet r\u00e9alis\u00e9 par la Soci\u00e9t\u00e9 Momentan\u00e9e (SM) AB &#8211; Valens &#8211; Equans.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pose de la premi\u00e8re pierre du nouveau campus de la Haute \u00c9cole L\u00e9onard de Vinci \u00e0 Woluwe-Saint-Lambert Le mercredi 20 mai, nous nous sommes r\u00e9unis \u00e0 Woluwe-Saint-Lambert pour la pose de la premi\u00e8re pierre du nouveau campus de la Haute \u00c9cole L\u00e9onard de Vinci. L&rsquo;\u00e9v\u00e9nement a d\u00e9but\u00e9 par une introduction de Julien Nicaise \/ Julien [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5105,"menu_order":50,"template":"","edition":[251],"project_category":[63],"project_branch":[218,206],"project_region":[48],"class_list":["post-5122","project","type-project","status-publish","has-post-thumbnail","hentry","edition-inside-41","project_category-en-cours","project_branch-ab-eiffage","project_branch-valens","project_region-bruxelles"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5122\/revisions"}],"predecessor-version":[{"id":5908,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/5122\/revisions\/5908"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media\/5105"}],"wp:attachment":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media?parent=5122"}],"wp:term":[{"taxonomy":"edition","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/edition?post=5122"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_category?post=5122"},{"taxonomy":"project_branch","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_branch?post=5122"},{"taxonomy":"project_region","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_region?post=5122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}