{"id":3756,"date":"2025-11-28T10:15:13","date_gmt":"2025-11-28T09:15:13","guid":{"rendered":"https:\/\/inside.eiffageconstructionbelux.be\/projecten\/linstitut-provincial-denseignement-technique-de-nivelles-sagrandit\/"},"modified":"2025-11-28T10:15:13","modified_gmt":"2025-11-28T09:15:13","slug":"linstitut-provincial-denseignement-technique-de-nivelles-sagrandit","status":"publish","type":"project","link":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/decembre-25\/projecten\/linstitut-provincial-denseignement-technique-de-nivelles-sagrandit\/","title":{"rendered":"L\u2019Institut Provincial d\u2019Enseignement Technique de Nivelles s\u2019agrandit"},"content":{"rendered":"<p>Le nouveau b\u00e2timent scolaire de l\u2019IPET Nivelles a \u00e9t\u00e9 livr\u00e9 en ao\u00fbt 2025, permettant \u00e0 l\u2019\u00e9tablissement d\u2019accueillir 200 \u00e9l\u00e8ves suppl\u00e9mentaires, portant ainsi sa capacit\u00e9 totale \u00e0 plus de 1.200 \u00e9l\u00e8ves. Le projet a \u00e9t\u00e9 men\u00e9 en Design &amp; Build par le groupement Atelier d\u2019Architecture DDV \u2013 Duch\u00eane \u2013 Fally &amp; Associ\u00e9s.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\">Un ensemble de trois b\u00e2timents polyvalents<\/span><\/p>\n<p>Le complexe comprend une cinquantaine de classes et bureaux, ainsi que plusieurs locaux sp\u00e9cifiques : chimie, biologie, dessin, informatique\u2026 Il dispose \u00e9galement d\u2019une salle d\u2019\u00e9tude, de locaux administratifs, d\u2019une cour de r\u00e9cr\u00e9ation arbor\u00e9e avec pr\u00e9au et zones de d\u00e9tente, d\u2019un parking et d\u2019un espace pour v\u00e9los.<\/p>\n<p>Dans une logique \u00e9co-responsable, le b\u00e2timent r\u00e9pond aux normes Q-ZEN de la R\u00e9gion wallonne. Les coursives ext\u00e9rieures en b\u00e9ton pr\u00e9fabriqu\u00e9 assurent la r\u00e9gulation thermique et renforcent la continuit\u00e9 entre espaces int\u00e9rieurs et ext\u00e9rieurs.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\">Une construction technique et durable<\/span><\/p>\n<p>Le projet a int\u00e9gr\u00e9 des solutions techniques innovantes : les coursives en b\u00e9ton pr\u00e9fabriqu\u00e9, un traitement acoustique performant dans les salles de classe gr\u00e2ce \u00e0 des plafonds en cellulose projet\u00e9e, et un b\u00e2timent enti\u00e8rement accessible PMR avec portes \u00e9largies et absence de seuils.<\/p>\n<p>L\u2019inauguration officielle a eu lieu le 28 ao\u00fbt 2025, marquant la mise en service de ce nouveau complexe, fonctionnel et moderne, au service de l\u2019enseignement.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le nouveau b\u00e2timent scolaire de l\u2019IPET Nivelles a \u00e9t\u00e9 livr\u00e9 en ao\u00fbt 2025, permettant \u00e0 l\u2019\u00e9tablissement d\u2019accueillir 200 \u00e9l\u00e8ves suppl\u00e9mentaires, portant ainsi sa capacit\u00e9 totale \u00e0 plus de 1.200 \u00e9l\u00e8ves. Le projet a \u00e9t\u00e9 men\u00e9 en Design &amp; Build par le groupement Atelier d\u2019Architecture DDV \u2013 Duch\u00eane \u2013 Fally &amp; Associ\u00e9s. &nbsp; Un ensemble de [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"menu_order":28,"template":"","edition":[173],"project_category":[64],"project_branch":[200],"project_region":[202],"class_list":["post-3756","project","type-project","status-publish","hentry","edition-decembre-25","project_category-livres","project_branch-duchene","project_region-nivelles"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/3756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":0,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/3756\/revisions"}],"wp:attachment":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media?parent=3756"}],"wp:term":[{"taxonomy":"edition","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/edition?post=3756"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_category?post=3756"},{"taxonomy":"project_branch","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_branch?post=3756"},{"taxonomy":"project_region","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_region?post=3756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}