{"id":2836,"date":"2025-08-22T16:09:49","date_gmt":"2025-08-22T14:09:49","guid":{"rendered":"https:\/\/inside.eiffageconstructionbelux.be\/projecten\/centre-culturel-de-maaseik-sous-un-nouveau-jour\/"},"modified":"2025-08-27T10:33:08","modified_gmt":"2025-08-27T08:33:08","slug":"centre-culturel-de-maaseik-sous-un-nouveau-jour","status":"publish","type":"project","link":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/septembre-25\/projecten\/centre-culturel-de-maaseik-sous-un-nouveau-jour\/","title":{"rendered":"Centre culturel de Maaseik sous un nouveau jour"},"content":{"rendered":"<p>Reynders a assur\u00e9 la r\u00e9novation en profondeur et la construction partielle du centre culturel de Maaseik. Dans le b\u00e2timent existant, le th\u00e9\u00e2tre, la caf\u00e9t\u00e9ria attenante et les bureaux de certains services communaux ont \u00e9t\u00e9 remis \u00e0 neuf et \u00e9quip\u00e9s de tout le confort moderne.<\/p>\n<p>\u00c0 l\u2019avant du site, une partie a \u00e9t\u00e9 d\u00e9molie afin de laisser place \u00e0 une nouvelle extension accueillant la biblioth\u00e8que actuelle. Le projet a \u00e9t\u00e9 abord\u00e9 dans sa globalit\u00e9, depuis la d\u00e9molition jusqu\u2019\u00e0 l\u2019am\u00e9nagement ext\u00e9rieur.<\/p>\n<p>D\u00e8s les premi\u00e8res phases, l\u2019option de r\u00e9aliser les structures en b\u00e9ton sous forme de pr\u00e9fabrication a \u00e9t\u00e9 envisag\u00e9e. Le nouveau b\u00e2timent s\u2019y pr\u00eatait parfaitement, ce qui a permis de confirmer rapidement ce choix. Elle a constitu\u00e9 la base d\u2019une collaboration fluide avec Vuylsteke-Eiffage, charg\u00e9 de la livraison de l\u2019ensemble des \u00e9l\u00e9ments en b\u00e9ton pr\u00e9fabriqu\u00e9.<\/p>\n<p>L\u2019am\u00e9nagement int\u00e9rieur a \u00e9galement \u00e9t\u00e9 soign\u00e9 dans les moindres d\u00e9tails : le mobilier de la biblioth\u00e8que, le comptoir d\u2019accueil et une grande partie de la menuiserie int\u00e9rieure ont \u00e9t\u00e9 r\u00e9alis\u00e9s avec soin par notre propre atelier de menuiserie et nos \u00e9quipes de pose.<\/p>\n<p>Le projet a \u00e9t\u00e9 men\u00e9 \u00e0 bien pour le compte de la Ville de Maaseik et du gestionnaire de projet Fluvius, qui en a assur\u00e9 le suivi. Les travaux se sont d\u00e9roul\u00e9s sur une p\u00e9riode de 18 mois.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Reynders a assur\u00e9 la r\u00e9novation en profondeur et la construction partielle du centre culturel de Maaseik. Dans le b\u00e2timent existant, le th\u00e9\u00e2tre, la caf\u00e9t\u00e9ria attenante et les bureaux de certains services communaux ont \u00e9t\u00e9 remis \u00e0 neuf et \u00e9quip\u00e9s de tout le confort moderne. \u00c0 l\u2019avant du site, une partie a \u00e9t\u00e9 d\u00e9molie afin de [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"menu_order":1,"template":"","edition":[140],"project_category":[64],"project_branch":[],"project_region":[153],"class_list":["post-2836","project","type-project","status-publish","hentry","edition-septembre-25","project_category-livres","project_region-maaseik-fr"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/2836","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":1,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/2836\/revisions"}],"predecessor-version":[{"id":2837,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project\/2836\/revisions\/2837"}],"wp:attachment":[{"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/media?parent=2836"}],"wp:term":[{"taxonomy":"edition","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/edition?post=2836"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_category?post=2836"},{"taxonomy":"project_branch","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_branch?post=2836"},{"taxonomy":"project_region","embeddable":true,"href":"https:\/\/inside.eiffageconstructionbelux.be\/fr\/wp-json\/wp\/v2\/project_region?post=2836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}